LiveTuesday · 27 October 2026Vol. VIII · No. 300
Bangalore
20°C · Overcast20°C
Tue, 27 Oct
Latest
Local

Residents bat for public transport over elevated corridor in south Bengaluru

Residents oppose Bengaluru’s 18.5-km elevated corridor, citing green spaces, land use, and toll concerns, urging improved public transport and first-mile connectivity.

Residents bat for public transport over elevated corridor in south Bengaluru

Updated - October 10, 2026 09:33 pm IST - Bengaluru

Nearly three residents’ associations have called for a human chain near the proposed alignment on Sunday (October 11) to raise awareness among citizens about the impact of the elevated corridor. | Photo Credit: FILE PHOTO

Adding to the continued resistance against Bengaluru Smart Infrastructure Limited’s (B-SMILE) elevated corridors project, residents of Jayanagar and surrounding areas are now opposing the proposed 18.5-km elevated corridor from Ragigudda Junction to Kanakapura Road in south Bengaluru, which will be tolled.

Nearly three residents’ associations have called for a human chain near the proposed alignment on Sunday to raise awareness among citizens about the impact of the elevated corridor.

The opposition follows strong resistance from residents of Indiranagar, C.V. Raman Nagar, and HAL against the elevated corridor between Old Madras Road and Silk Board Junction. Separate groups in east Bengaluru have been opposing the project, with one of them conducting an independent, citizen-led survey of trees to assess the impact on green spaces.

In August, the B-SMILE floated tenders for the Ragigudda corridor, prompting residents to consult traffic and transport experts and review the Detailed Project Report (DPR).

Green spaces and land acquisition

Guruprasad D.N., one of the organisers, said a major concern was the need for the flyover. “There is already metro connectivity along the alignment currently planned by the B-SMILE. The actual requirement is to fix first- and last-mile connectivity,” he said.

The group also pointed out that the alignment passes through Rose Garden and Pipeline Road, both of which have extensive green spaces. Besides, the project also requires forest land near the NICE Road.

According to the official documents, the project requires 16,445 sq. m of government land, including corporation and forest land, as well as 13,481 sq. m of private land. Mr. Guruprasad said the private land requirement covers 24 properties.

The group also flagged that the elevated corridor would pass within a few feet of private properties, causing inconvenience to several households along the alignment.

B.S. Prahallad, Technical Director of B-SMILE, defended the project, citing the year-on-year traffic growth indicated in the DPR.

“We agree that it will be an inconvenience to local residents, be it during the acquisition or construction period, but a substantial number of commuters will gain from the corridor. These corridors are planned with the future in mind,” he said.

Public transport could help

The DPR states that the traffic capacity of most junctions along the proposed corridor has already exceeded their design capacity of 10,000 Passenger Car Units (PCUs) per hour, requiring immediate intervention to prevent bottlenecks.

The corridor primarily covers seven junctions — Rose Garden, Sarakki Junction, Konanakunte Cross 1 and 2, A2B Junction, 80 Feet Road Junction, and Turahalli Junction — where PCU growth is projected to be nearly 90% over 10 years.

For instance, the PCU count at Rose Garden in 2025 was 6,169, which is projected to rise to 11,599 by 2035. However, the DPR also offers two options to meet the growing demand, including policy changes, a modal shift, and the promotion of public transport.

Published - October 10, 2026 09:04 pm IST

Terms & conditions | Institutional Subscriber

Comments have to be in English, and in full sentences. They cannot be abusive or personal. Please abide by our community guidelines for posting your comments.

We have migrated to a new commenting platform. If you are already a registered user of The Hindu and logged in, you may continue to engage with our articles. If you do not have an account please register and login to post comments. Users can access their older comments by logging into their accounts on Vuukle.

Related in Local

Karnataka SIR: Final electoral roll out on October 27; net additions remain minuscule
Local

Karnataka SIR: Final electoral roll out on October 27; net additions remain minuscule

After more than three months of a clean-up drive under the Special Intensive Revision (SIR) of electoral rolls, Karnataka’s final electoral roll will be published on October 27. The list will be uploaded on the website of the Chief Electoral Officer, Karnataka.

The Hindu — Bangalore26 Oct
Delhi teenager’s Project Sadak logs 2,927 road complaints across Delhi, Mumbai, Bengaluru; tracks 190 repairs
Local

Delhi teenager’s Project Sadak logs 2,927 road complaints across Delhi, Mumbai, Bengaluru; tracks 190 repairs

16-year-old Parth Anand’s Project Sadak uses AI to log pothole complaints, route them to authorities, and track repairs across three Indian cities.

The Hindu — Bangalore26 Oct
‘Omission leads to discrimination’: Civil society group in Bengaluru flags institutional failures behind student suicides
Local

‘Omission leads to discrimination’: Civil society group in Bengaluru flags institutional failures behind student suicides

Civil society calls for independent probes, Rohith Act implementation, and stronger anti-discrimination protections after student suicides in India's higher education.

The Hindu — Bangalore26 Oct
Lift protest curbs by Constitution Day or face civil disobedience, groups in Bengaluru tell Karnataka government
Local

Lift protest curbs by Constitution Day or face civil disobedience, groups in Bengaluru tell Karnataka government

Civil society groups urge Karnataka to lift Bengaluru protest curbs by Constitution Day, threatening civil disobedience if restrictions persist.

The Hindu — Bangalore26 Oct
Hennur–Bagalur Main Road may be made signal-free or get elevated corridor after feasibility study
Local

Hennur–Bagalur Main Road may be made signal-free or get elevated corridor after feasibility study

Feasibility study could steer Hennur–Bagalur Road toward signal-free or elevated corridor, with ongoing white-topping and traffic upgrades proceeding.

The Hindu — Bangalore26 Oct
Bengaluru Traffic Police book 539 cases in special drive against drunk driving, overspeeding
Local

Bengaluru Traffic Police book 539 cases in special drive against drunk driving, overspeeding

Bengaluru Traffic Police nabbed 539 drunk driving and overspeeding cases in a five-day citywide drive, checking 24,243 vehicles.

The Hindu — Bangalore26 Oct

Latest Across Vijaya Chronicle